An electrical safety program only works if it is written for your site and your crews know it. AAAT3 writes and audits NFPA 70E programs and trains qualified and unqualified workers, so your program holds up in the field and in an audit.
- Written NFPA 70E program
- Qualified person training
- Unqualified worker awareness
- Arc flash PPE
- Program audits
By the numbers
Why training matters
Electrical fatality victims who were not in electrical jobs, so every trade needs awareness
ESFI from BLS data, 2025Construction workers electrocuted in 2023
BLS via Maryland MOSH, 2025Maximum interval NFPA 70E allows between retraining for qualified workers
NFPA 70EWhat’s included
A program your crews actually follow
Paper programs fail. We build programs, training and audits that work on the job.
Written program
Your NFPA 70E program should match your work, your gear and your people.
- Program written or updated to current NFPA 70E
- Risk assessment procedures
- Job briefing forms
- PPE selection method
Training
Qualified and unqualified workers need different training.
- Qualified person classroom and field training
- Unqualified worker awareness
- Retraining at least every 3 years
- Training records and rosters
Audits
NFPA 70E requires audits of the program and the field work.
- Field work audits at least yearly
- Program audits at least every 3 years
- PPE and test meter inspections
- Corrective action tracking
Project management and consulting
Project management and consulting for NFPA 70E
AAAT3 can write your program, run your training or manage the electrical safety program for a project.
Program writing and updates
Written NFPA 70E program matched to your company and current edition.
Best for: Contractors and owners updating to a new editionQualified person training
Classroom and hands-on training with documented field evaluation.
Best for: Electrical crews and supervisorsAwareness training for all trades
Short awareness sessions for non-electrical workers on site.
Best for: Large mixed-trade sitesProgram and field audits
Audits that meet NFPA 70E requirements with a fix list.
Best for: Companies due for auditsPPE and meter programs
Selection, inspection and replacement rules for arc flash PPE and test equipment.
Best for: Crews with mixed or aging gearElectrical safety program management
AAAT3 manages the program for your project from start to turnover.
Best for: Projects without a dedicated electrical safety leadHow it works
From gap check to a working program
Assess
Current program, gear and training.
Write
Program and procedures updated.
Train
Qualified and awareness training.
Equip
PPE and meters checked.
Audit
Field and program audits.
Improve
Fixes tracked to closure.
Rule of thumb: if a qualified worker cannot explain the arc flash boundary for the gear in front of them, the training did not work.
Ways to work with us
Pick the level of support you need
Start small with a review, put a qualified person on site, or hand us the whole program. Every option is priced to your scope.
Quick start
Program gap check
A review of your written program against current NFPA 70E.
- Program review
- Gap list
- Priority fixes
- Report in days
Most popular
Training package
Qualified and awareness training for your crews.
- Classroom training
- Field evaluation
- Records and rosters
- Certificates
Full program
Program management
We write, train, audit and manage your program.
- Program writing
- Training
- Audits
- Owner reporting
What you get
Deliverables
NFPA 70E program
Written program matched to your work.
Job briefing forms
Simple forms crews use before each task.
Training records
Who is qualified, for what, and when it expires.
PPE guide
What PPE to wear for each task.
Audit reports
Program and field audits with fixes.
Corrective action log
Every fix tracked to closure.
Standards
Codes and standards we work to
Electrical safety
3- NFPA 70E
Electrical safety in the workplaceIndustry
- 29 CFR 1910.332
Electrical safety trainingFederal
- 29 CFR 1926.21
Safety training and educationFederal
Supporting
3- IEEE 1584
Arc flash hazard calculationsIndustry
- ASTM F1506
Arc rated clothingIndustry
- EM 385-1-1
USACE safety and health requirementsFederal
Related data center services
Every phase of the build, one partner
Where we do this work
Is your NFPA 70E program current? Get a gap check before your next audit or energization.
Get an NFPA 70E QuoteFAQ
Common questions
How often must qualified workers be retrained?
NFPA 70E requires retraining at intervals not to exceed 3 years, and sooner if audits or job changes show a need.
How often must the program be audited?
The overall program must be audited at least every 3 years, and field work must be audited at least once a year.
What is a qualified person?
Someone with the skills and knowledge for the equipment and work, who has had safety training to identify and avoid the hazards involved.
Do non-electrical workers need training?
Yes. Unqualified workers need training on the hazards and on staying outside the boundaries. Most electrical fatality victims are not in electrical jobs.
Can AAAT3 train our crews?
Yes. We provide qualified person and awareness training with field evaluation and records.
Get a quote for NFPA 70E Program & Qualified Person Training
Tell us about your project, location and start date. We reply with a plan and pricing.
Service network