Data centers are electrical projects with a building around them. AAAT3 manages electrical safety from first energization to live white space, so shocks, arc flash and outages never reach your crews or your client.

  • NFPA 70E programs
  • Energization plans
  • LOTO & EEWP
  • Arc flash studies
  • Qualified person audits

By the numbers

What poor electrical safety costs

1,940

Workplace electrical deaths from 2011 to 2023. Construction had the most of any industry

ESFI from BLS data, 2025
74%

Share of electrical fatality victims who were not in electrical jobs, so every trade on site is at risk

ESFI from BLS data, 2025
5,180

Electrical injuries with days away from work in 2023 and 2024, with a median of 10 days lost

ESFI, 2026
66

Construction workers electrocuted in 2023, one of OSHA’s Focus Four hazards

BLS via Maryland MOSH, 2025

What’s included

Electrical safety from first energization to live white space

Energization changes everything on a data center job. We make sure the plan, the people and the paperwork change with it.

01

Energization and LOTO

The day the building goes live is the most dangerous day of the project.

  • Energization plans and sequence
  • Lockout tagout and group LOTO procedures
  • Energized electrical work permits (EEWP)
  • Barricades, signage and access control
Energization and LOTO details →
02

NFPA 70E program and training

Qualified and unqualified workers need different rules, training and gear.

  • Written NFPA 70E program review
  • Qualified person training and audits
  • Arc flash PPE selection and inspection
  • Shock and arc flash risk assessments
NFPA 70E program details →
03

Switchgear, UPS and battery rooms

High energy gear needs strict rules for testing, startup and maintenance.

  • Arc flash labels and study review
  • Battery room hazards and spill control
  • Test equipment and meter checks
  • Startup and testing safety plans
Switchgear and UPS details →

Project management and consulting

Project management and consulting for electrical work

AAAT3 can lead the electrical safety program, manage the energization package or advise your team where you need help.

Energization program management

We plan and run the energization sequence with the GC, electrical sub, utility and commissioning agent.

Best for: Projects moving from construction to live power

NFPA 70E program consulting

We write or audit your electrical safety program, LOTO procedures and permit forms to the current NFPA 70E.

Best for: Contractors and owners who need an audit-ready program

Arc flash study coordination

We coordinate the engineering study, label review and updates when the design or settings change.

Best for: New builds, expansions and gear changes

Electrical safety staffing

Electrical safety professionals on site to run permits, LOTO and daily audits.

Best for: Large crews and energized white space work

Electrical incident investigation

Root cause analysis, corrective actions and documentation after a shock, arc flash or near miss.

Best for: Any project after an electrical event

Electrical QC (USACE CQM)

Three phase inspections, test reports and as-built checks for electrical systems.

Best for: Federal and military data centers

How it works

From design review to live power

Review

Drawings, one-lines and arc flash study.

Program

NFPA 70E program, LOTO and permits.

Training

Qualified person training and audits.

Energize

Energization plan, barricades and access.

Oversee

Daily audits, EEWP and LOTO checks.

Turnover

Labels, records and lessons learned.

Rule of thumb: treat every piece of gear as energized until it has been tested and locked out, and retrain the whole site the week before first energization.

Ways to work with us

Pick the level of support you need

Start small with a review, put a qualified person on site, or hand us the whole program. Every option is priced to your scope.

Quick start

Electrical program audit

A review of your NFPA 70E program, LOTO procedures and permits.

  • Program and procedure review
  • Field audit of crews
  • Gap list with fixes
  • Report in days
Request an audit

Most popular

On-site electrical safety

A qualified AAAT3 electrical safety lead on your site.

  • LOTO and EEWP control
  • Daily field audits
  • Energization support
  • Toolbox talks
Get an on-site quote

Full program

Energization management

We manage the energization package and the electrical safety program.

  • Energization sequence
  • Arc flash coordination
  • Qualified person program
  • Owner reporting
Talk to a project manager

What you get

Deliverables

Electrical safety program

NFPA 70E program matched to your site.

Energization plan

Sequence, roles, barricades and communication.

LOTO procedures

Equipment specific and group lockout steps.

Permit log

Energized work permits tracked to closure.

Qualified person roster

Who is trained for what, and when it expires.

Weekly safety report

Audits, findings and fixes in plain language.

Standards

Codes and standards we work to

Electrical safety

3
  • NFPA 70E

    Electrical safety in the workplaceIndustry

  • 29 CFR 1926 Subpart K

    Electrical in constructionFederal

  • 29 CFR 1910.147

    Control of hazardous energyFederal

Design and equipment

3
  • NFPA 70 (NEC)

    National Electrical CodeIndustry

  • IEEE 1584

    Arc flash hazard calculationsIndustry

  • EM 385-1-1

    USACE safety and health requirementsFederal

FAQ

Common questions

What is NFPA 70E?

NFPA 70E is the national standard for electrical safety in the workplace. It covers safe work practices, energized work permits, arc flash risk assessment, PPE and training for qualified workers.

When is an energized electrical work permit required?

Generally when work is done on or near exposed energized parts that have not been put in an electrically safe work condition. NFPA 70E lists the limited exceptions.

Can AAAT3 manage our energization?

Yes. We plan and run the energization sequence with the GC, electrical subcontractor, utility and commissioning agent.

Do you do arc flash studies?

We coordinate the engineering study with a licensed engineer, review the labels and keep them updated when the design or settings change.

Who needs electrical safety training?

Anyone who works on or near energized equipment, plus unqualified workers who must know the hazards and boundaries. On a data center that is most of the site.

Get a quote for Electrical Safety & NFPA 70E Oversight

Tell us about your project, location and start date. We reply with a plan and pricing.

Name
What do you need help with?