Home › Services › Preconstruction
Preconstruction
Site Safety Plans, QC Plans & Permits
You can’t mobilize until your safety paperwork is accepted. AAAT3 writes the Accident Prevention Plan, site safety and health plan, activity hazard analyses, quality control plan and permit package your contract calls for, so your crew starts on day one instead of waiting on comments.
- APP / SSHP
- Activity hazard analyses
- CQC plans
- Permits & programs
- EM 385-1-1 format
By the numbers
Why a real safety plan pays for itself
U.S. construction workers died on the job in 2024, about 1 in 5 of all workplace deaths.
BLS Census of Fatal Occupational Injuries, 2024Share of those construction deaths caused by falls, slips and trips.
BLS CFOI, 2024Fall protection (1926.501) has been OSHA’s most-cited standard 15 years running, with 6,992 citations in FY2025.
OSHA Top 10, FY2025Maximum OSHA penalty per willful or repeated violation. A single serious violation can cost up to $16,550.
OSHA civil penalty amounts, 2025On federal jobs: under EM 385-1-1, no work starts until the Accident Prevention Plan is accepted, and each activity needs an accepted AHA before it begins. A late plan is a late job.

Why plans get rejected
Boilerplate doesn’t pass review
Reviewers can spot a plan copied from another job in minutes. We build yours from your contract, your site and your crews, so it holds up on the first submittal.
- Generic hazards that don’t match the actual site
- Competent persons and qualifications not named
- AHAs missing for definable features of work
- No emergency plan or route to the nearest hospital
- Subcontractors and their programs not covered
- Wrong format for the EM 385-1-1 APP outline
How we build your plan
Six steps from contract to accepted plan
Kickoff
Contract, specs, schedule, site photos and your crew list.
Hazard map
Every task and site condition that can hurt someone.
Write APP / SSHP
Site-specific plan in the format your contract requires.
AHAs
One analysis per definable feature of work, with controls and competent persons.
Submit & respond
We answer reviewer comments until the plan is accepted.
Keep current
Updates for new phases, new subs and site changes.
Rule of thumb: use one list of definable features of work for your AHAs and your three-phase QC inspections. When the safety plan and the QC plan match, reviewers approve both faster.
What you get
Deliverables
Accident Prevention Plan
Site-specific APP to EM 385-1-1, ready to submit.
Site Safety & Health Plan
SSHP, or a HASP for hazmat sites under 29 CFR 1910.120.
Activity Hazard Analyses
One AHA per definable feature of work, with hazards, controls and training.
Contractor QC Plan
CQC plan with the three-phase inspection system and testing log.
Permit & program log
Hot work, excavation, confined space, energized work and lift plans.
Subcontractor safety packet
Prequalification checklist, training records and flow-down requirements.
Every plan comes as an editable Word file plus a print-ready PDF for the site binder.
Standards we write to
Built on the rules your reviewer uses
20 standards in 4 groupsFederal government requirement or guideIndustry recognized best practice
Federal contract requirements
5- EM 385-1-1
USACE Safety and Health Requirements Manual, including the APP outline Federal
- FAR 52.236-13
Accident Prevention clause Federal
- UFGS 01 35 26
Governmental safety requirements specification Federal
- UFGS 01 45 00.00 10
USACE quality control specification Federal
- FAR 52.246-12
Inspection of Construction Federal
OSHA construction
6- 1926.20 / .21
General safety program and training Federal
- 1926 Subpart M
Fall protection, including 1926.501 and 1926.503 Federal
- 1926 Subpart P
Excavations and trenching Federal
- 1926 Subpart AA
Confined spaces in construction Federal
- 1926 Subpart CC
Cranes and derricks Federal
- 1910.120
HAZWOPER site safety and health plans Federal
Safety management systems
4- ANSI/ASSP A10.33
Safety and health programs for multi-employer projects Industry
- ANSI/ASSP Z10
Occupational health and safety management systems Industry
- ISO 45001
International OH&S management system standard Industry
- NFPA 70E
Electrical safety in the workplace Industry
Permits & site programs
5- 1926.352 / NFPA 51B
Hot work and fire prevention Industry
- 1926.1205
Confined space entry permits Federal
- 1926.651(k)
Daily excavation inspections by a competent person Federal
- NFPA 70E 130.2
Energized electrical work permits Industry
- EM 385-1-1
Critical lift plans for cranes Federal
Where we do this work
Plan rejected, or starting in two weeks? Send us the contract and the review comments and we’ll get you a corrected plan.
Request a safety plan reviewFAQ
Safety plan questions
What is an Accident Prevention Plan (APP)?
It is the site-specific safety plan required on USACE and NAVFAC construction contracts under EM 385-1-1 and FAR 52.236-13. It names your safety staff, lists the hazards on this job, and explains how you will control them. Work cannot start until the Government accepts it.
Do I need a written safety plan on a commercial job?
OSHA 29 CFR 1926.20 requires every construction employer to run a safety program, and most owners and general contractors now require a site-specific safety plan before you mobilize. We write it to the owner or GC requirements and ANSI/ASSP A10.33.
Can you fix a plan the Contracting Officer rejected?
Yes. Send us the plan and the review comments. We answer each comment, correct the plan and AHAs, and give you a clean resubmittal.
Do you write the Quality Control plan too?
Yes. We write the Contractor Quality Control (CQC) plan with the three-phase inspection system, using the same list of definable features of work as your AHAs so the two plans match.
Can you provide a safety officer on site?
Planning and paperwork are done remotely. On-site safety and QC staff can be quoted separately. Tell us what you need in the quote form.
Get a quote for Safety Plans, QC Plans & Permits
Tell us about your contract, location and start date. We reply with a plan and pricing.
Service network