Preconstruction

Site Safety Plans, QC Plans & Permits

You can’t mobilize until your safety paperwork is accepted. AAAT3 writes the Accident Prevention Plan, site safety and health plan, activity hazard analyses, quality control plan and permit package your contract calls for, so your crew starts on day one instead of waiting on comments.

  • APP / SSHP
  • Activity hazard analyses
  • CQC plans
  • Permits & programs
  • EM 385-1-1 format
Example submittal tracker for a site safety plan packageSafety submittalStatusAccident Prevention PlanAcceptedSite Safety & Health PlanAcceptedActivity Hazard Analyses (12)In reviewContractor QC PlanIn reviewHot work & excavation permitsDraftSub prequalification (6 of 8)DraftNo accepted APP = no mobilization
Example: one accepted plan package keeps the whole schedule moving.

By the numbers

Why a real safety plan pays for itself

1,034

U.S. construction workers died on the job in 2024, about 1 in 5 of all workplace deaths.

BLS Census of Fatal Occupational Injuries, 2024
38%

Share of those construction deaths caused by falls, slips and trips.

BLS CFOI, 2024
15 yrs

Fall protection (1926.501) has been OSHA’s most-cited standard 15 years running, with 6,992 citations in FY2025.

OSHA Top 10, FY2025
$165,514

Maximum OSHA penalty per willful or repeated violation. A single serious violation can cost up to $16,550.

OSHA civil penalty amounts, 2025

On federal jobs: under EM 385-1-1, no work starts until the Accident Prevention Plan is accepted, and each activity needs an accepted AHA before it begins. A late plan is a late job.

Construction crew in hard hats and safety vests at a jobsite safety meeting
Safety stand-down on a federal project. Photo: U.S. Navy / NAVFAC, CC BY 2.0

Why plans get rejected

Boilerplate doesn’t pass review

Reviewers can spot a plan copied from another job in minutes. We build yours from your contract, your site and your crews, so it holds up on the first submittal.

  • Generic hazards that don’t match the actual site
  • Competent persons and qualifications not named
  • AHAs missing for definable features of work
  • No emergency plan or route to the nearest hospital
  • Subcontractors and their programs not covered
  • Wrong format for the EM 385-1-1 APP outline

How we build your plan

Six steps from contract to accepted plan

Kickoff

Contract, specs, schedule, site photos and your crew list.

Hazard map

Every task and site condition that can hurt someone.

Write APP / SSHP

Site-specific plan in the format your contract requires.

AHAs

One analysis per definable feature of work, with controls and competent persons.

Submit & respond

We answer reviewer comments until the plan is accepted.

Keep current

Updates for new phases, new subs and site changes.

Rule of thumb: use one list of definable features of work for your AHAs and your three-phase QC inspections. When the safety plan and the QC plan match, reviewers approve both faster.

What you get

Deliverables

Accident Prevention Plan

Site-specific APP to EM 385-1-1, ready to submit.

Site Safety & Health Plan

SSHP, or a HASP for hazmat sites under 29 CFR 1910.120.

Activity Hazard Analyses

One AHA per definable feature of work, with hazards, controls and training.

Contractor QC Plan

CQC plan with the three-phase inspection system and testing log.

Permit & program log

Hot work, excavation, confined space, energized work and lift plans.

Subcontractor safety packet

Prequalification checklist, training records and flow-down requirements.

Every plan comes as an editable Word file plus a print-ready PDF for the site binder.

Standards we write to

Built on the rules your reviewer uses

20 standards in 4 groupsFederal government requirement or guideIndustry recognized best practice

Federal contract requirements

5
  • EM 385-1-1

    USACE Safety and Health Requirements Manual, including the APP outline Federal

  • FAR 52.236-13

    Accident Prevention clause Federal

  • UFGS 01 35 26

    Governmental safety requirements specification Federal

  • UFGS 01 45 00.00 10

    USACE quality control specification Federal

  • FAR 52.246-12

    Inspection of Construction Federal

OSHA construction

6
  • 1926.20 / .21

    General safety program and training Federal

  • 1926 Subpart M

    Fall protection, including 1926.501 and 1926.503 Federal

  • 1926 Subpart P

    Excavations and trenching Federal

  • 1926 Subpart AA

    Confined spaces in construction Federal

  • 1926 Subpart CC

    Cranes and derricks Federal

  • 1910.120

    HAZWOPER site safety and health plans Federal

Safety management systems

4
  • ANSI/ASSP A10.33

    Safety and health programs for multi-employer projects Industry

  • ANSI/ASSP Z10

    Occupational health and safety management systems Industry

  • ISO 45001

    International OH&S management system standard Industry

  • NFPA 70E

    Electrical safety in the workplace Industry

Permits & site programs

5
  • 1926.352 / NFPA 51B

    Hot work and fire prevention Industry

  • 1926.1205

    Confined space entry permits Federal

  • 1926.651(k)

    Daily excavation inspections by a competent person Federal

  • NFPA 70E 130.2

    Energized electrical work permits Industry

  • EM 385-1-1

    Critical lift plans for cranes Federal

FAQ

Safety plan questions

What is an Accident Prevention Plan (APP)?

It is the site-specific safety plan required on USACE and NAVFAC construction contracts under EM 385-1-1 and FAR 52.236-13. It names your safety staff, lists the hazards on this job, and explains how you will control them. Work cannot start until the Government accepts it.

Do I need a written safety plan on a commercial job?

OSHA 29 CFR 1926.20 requires every construction employer to run a safety program, and most owners and general contractors now require a site-specific safety plan before you mobilize. We write it to the owner or GC requirements and ANSI/ASSP A10.33.

Can you fix a plan the Contracting Officer rejected?

Yes. Send us the plan and the review comments. We answer each comment, correct the plan and AHAs, and give you a clean resubmittal.

Do you write the Quality Control plan too?

Yes. We write the Contractor Quality Control (CQC) plan with the three-phase inspection system, using the same list of definable features of work as your AHAs so the two plans match.

Can you provide a safety officer on site?

Planning and paperwork are done remotely. On-site safety and QC staff can be quoted separately. Tell us what you need in the quote form.