Home › Data Center Services › Commissioning › Level 5 IST

Commissioning Level 5

Integrated Systems Testing (IST)

IST fails utility power, cooling and controls on purpose to prove the data center can ride through. It is the riskiest day of commissioning. AAAT3 plans IST safety, scripts and stop rules so the test proves the building without hurting anyone or breaking anything.

  • IST script review
  • Failure scenario walkthroughs
  • Stop rules
  • Roles & communication
  • Issue closure

By the numbers

Why IST must be planned to the minute

45%

Share of impactful outages caused by power problems in 2025

Uptime Institute Outage Analysis, 2026
57%

Operators whose last major outage cost more than $100,000

Uptime Institute Outage Analysis, 2026
87%

Operators who say their last impactful outage could have been avoided with better management or processes

Uptime Institute Outage Analysis, 2026

What’s included

Prove the whole building works

IST is where every system meets. We make sure the people are as ready as the gear.

01

Script review

Every step and expected result written and checked.

  • Scenario by scenario review
  • Expected readings and timings
  • Safety holds and checks
  • Script version control
02

Readiness and walkthroughs

No IST starts with open Level 4 issues.

  • Level 4 issue closure check
  • Tabletop walkthrough of each scenario
  • Load bank and heat plans
  • Equipment and area readiness
03

Roles and stop rules

Many people, many radios, one plan.

  • Test director and roles
  • Communication plan and radio channels
  • Stop words and stop authority
  • Post-test reset and lessons

Project management and consulting

Project management and consulting for IST

AAAT3 can manage IST readiness, review scripts for safety or run the floor during testing.

IST readiness management

Checks that every prerequisite is done before IST starts.

Best for: Projects nearing Level 5

IST safety review

Independent safety review of scripts and scenarios.

Best for: Owners and Cx agents

Floor control during IST

AAAT3 leads on the floor for access, zones and stop rules.

Best for: Large IST events with many trades

Tabletop facilitation

Walk through each scenario with all parties before testing.

Best for: First-time IST teams

Issue closure tracking

IST findings tracked to verified closure before turnover.

Best for: Projects with open IST issues

Lessons learned

Post-IST review that feeds the next building.

Best for: Owners building multiple halls

How it works

From scripts to signed IST

Review

Scripts and scenarios checked.

Ready

Level 4 closed, load banks set.

Walk

Tabletop of every scenario.

Test

Scenarios run under control.

Fix

Findings fixed and retested.

Sign

IST complete and documented.

Rule of thumb: no IST starts until every Level 4 issue is closed and every person on the floor knows the stop words.

Ways to work with us

Pick the level of support you need

Start small with a review, put a qualified person on site, or hand us the whole program. Every option is priced to your scope.

Quick start

IST script review

Safety review of your IST scripts.

  • Script review
  • Gap list
  • Stop rules
  • Report in days
Request a review

Most popular

IST floor support

AAAT3 leads on the floor during IST.

  • Access and zones
  • Stop rules
  • Communication
  • Event log
Get a quote

Full program

IST management

We manage IST readiness, testing and closure.

  • Readiness checks
  • Tabletops
  • Floor control
  • Owner reporting
Talk to a project manager

What you get

Deliverables

IST readiness checklist

Every prerequisite checked.

Script safety review

Findings and changes.

Communication plan

Roles, radios and stop words.

Event log

What happened, when.

Issue log

Findings tracked to closure.

Lessons learned

What to change next time.

Standards

Codes and standards we work to

Commissioning

3
  • ASHRAE Guideline 0

    The commissioning processIndustry

  • ASHRAE Standard 202

    Commissioning process for buildings and systemsIndustry

  • NFPA 110

    Emergency and standby power testingIndustry

Safety

3
  • NFPA 70E

    Electrical safety in the workplaceIndustry

  • ANSI/TIA-942

    Data center infrastructureIndustry

  • EM 385-1-1

    USACE safety and health requirementsFederal

FAQ

Common questions

What is IST?

Integrated systems testing is commissioning Level 5. It tests the whole data center together, often by failing utility power or cooling on purpose to prove backups take over.

Who runs IST?

Usually the commissioning agent leads, with the owner, GC, trades and vendors on the floor. AAAT3 can support safety, readiness and floor control.

What are stop rules?

Agreed conditions and words that stop the test right away, with named people who have the authority to stop it.

How long does IST take?

It depends on the size and number of scenarios. Large facilities can take several days per hall.

Can AAAT3 review our IST scripts?

Yes. We do an independent safety review of scripts and scenarios before testing.