With vacancy near 1%, most new capacity is built right next to halls that are already full and running. AAAT3 plans and manages expansions on live campuses, with tie-ins, separation and phased turnover that never put existing clients at risk.

  • Tie-in & cutover planning
  • Live site separation
  • Phased turnover
  • Shared utility coordination
  • Client communication

By the numbers

Why live site expansions need a plan

66 GW

Data center capacity under construction in North America

JLL, Midyear 2026
About 1%

North American data center vacancy, the third straight year near this level

JLL, Midyear 2026
57%

Operators whose last major outage cost more than $100,000

Uptime Institute Outage Analysis, 2026

What’s included

Build the new hall without touching the old one

Separation, tie-ins and turnover planned around the clients already in the building.

01

Separation

Keep construction traffic, dust and crews away from live space.

  • Construction and live boundaries
  • Separate access and routes
  • Dust and noise barriers
  • Security for live areas
02

Tie-ins and cutovers

New power, cooling and fiber must connect to running systems.

  • Tie-in MOPs and windows
  • Shutdown and rollback plans
  • Utility and owner approvals
  • Go or no-go calls
03

Phased turnover

New halls go live one by one while work continues next door.

  • Phase boundaries and schedules
  • Commissioning by phase
  • Turnover inside active sites
  • Operations handoff

Project management and consulting

Project management and consulting for expansions

AAAT3 can manage the expansion, run the operations interface or plan the tie-ins.

Expansion project management

Schedule, trades and owner reporting for new phases on live campuses.

Best for: Operators adding capacity

Operations interface management

Bridge between construction and the facility team.

Best for: Expansions next to running halls

Tie-in and cutover planning

MOPs, windows and rollback plans for every connection.

Best for: Shared power, cooling and fiber systems

Phasing and logistics

Boundaries, routes and laydown planned around live operations.

Best for: Tight campuses with limited space

Client communication support

Notices and updates for tenants affected by work.

Best for: Colocation sites

Federal expansions

EM 385-1-1 and USACE CQM on federal campuses.

Best for: Federal and military data centers

How it works

From plan to live new hall

Assess

Live systems and shared utilities.

Separate

Boundaries, access and barriers.

Build

Construction under live site rules.

Tie in

Connections under MOPs.

Commission

Testing by phase.

Turn over

New hall handed to operations.

Rule of thumb: every tie-in to a live system gets a MOP, a window and a rollback plan, no exceptions.

Ways to work with us

Pick the level of support you need

Start small with a review, put a qualified person on site, or hand us the whole program. Every option is priced to your scope.

Quick start

Expansion risk review

A review of your expansion plan and tie-ins.

  • Plan review
  • Tie-in list
  • Risk fixes
  • Report in days
Request a review

Most popular

Operations interface

AAAT3 manages the boundary between construction and operations.

  • MOP tracking
  • Access control
  • Tie-in coordination
  • Weekly reports
Get a quote

Full program

Expansion management

We manage the expansion from planning to turnover.

  • Schedule and trades
  • Tie-ins
  • Phased turnover
  • Owner reporting
Talk to a project manager

What you get

Deliverables

Expansion plan

Phases, boundaries and schedule.

Tie-in register

Every connection with its MOP and window.

Separation plan

Access, barriers and routes.

Phased turnover plan

Which halls go live and when.

Client notices

Updates for affected tenants.

Weekly report

Progress and risks.

Standards

Codes and standards we work to

Data center

3
  • ANSI/TIA-942

    Data center infrastructureIndustry

  • NFPA 75

    Protection of IT equipmentIndustry

  • NFPA 241

    Safeguarding construction operationsIndustry

Safety and federal

3
  • NFPA 70E

    Electrical safety in the workplaceIndustry

  • 29 CFR 1926

    Construction safety standardsFederal

  • EM 385-1-1

    USACE safety and health requirementsFederal

FAQ

Common questions

Why are live site expansions risky?

New work connects to power, cooling and fiber that existing clients depend on. Dust, access and tie-ins can all cause outages if not controlled.

What is a tie-in?

The point where new systems connect to existing ones, such as a new feeder to live switchgear or a new loop to a running chilled water system.

Can AAAT3 manage the whole expansion?

Yes. We manage schedule, trades, tie-ins and phased turnover.

Do you work with operations teams?

Yes. We act as the interface between construction and the facility team so operations stays first.

Do you work on federal campuses?

Yes. We work to EM 385-1-1 and USACE CQM on federal expansions.