Commissioning Levels 1 and 2

Factory Witness Testing & Installation Checks

Problems found at the factory cost a phone call. Problems found at IST cost weeks. AAAT3 supports factory witness tests and installation checks so generators, UPS, switchgear and cooling gear arrive right and get installed right.

  • Factory witness tests
  • Submittal checks
  • Delivery inspections
  • Pre-functional checklists
  • Installation verification

By the numbers

Why early commissioning pays

10,000+

Deficiencies found by commissioning, from data on only one third of the buildings studied

Lawrence Berkeley National Lab, 2009
4.2 yrs

Median payback for commissioning new buildings

Lawrence Berkeley National Lab, 2009
2 to 3 yrs

Lead times for large power transformers, so damaged or wrong gear can wreck a schedule

POWER Magazine and Wood Mackenzie, 2025

What’s included

Catch it before it ships, catch it before it’s covered

Levels 1 and 2 are the cheapest place to find a problem.

01

Factory witness tests

Watch the gear run at the factory before you accept it.

  • Test procedures reviewed in advance
  • Witness at the factory or remote
  • Results checked against the spec
  • Punch items before shipping
02

Delivery inspections

Gear can be damaged or wrong when it arrives.

  • Shipping damage checks
  • Nameplate and model checks
  • Spare parts and documents received
  • Storage and protection rules
03

Installation checks

Pre-functional checklists prove the gear is ready to start.

  • Anchoring, clearances and connections
  • Torque and termination records
  • Labels and arc flash labels
  • Pre-functional checklists signed

Project management and consulting

Project management and consulting for Levels 1 and 2

AAAT3 can manage factory testing and installation checks, or support your commissioning agent.

Factory test coordination

Schedule, scripts and witness for long lead equipment.

Best for: Projects buying generators, UPS and switchgear

Submittal and spec review

Check submittals against design before release.

Best for: Owners and GCs with many equipment packages

Receiving inspection program

Delivery checks, storage rules and damage claims.

Best for: Sites receiving high value gear

Pre-functional checklist management

Checklists issued, completed and verified by trade.

Best for: Projects heading into startup

Commissioning QC (USACE CQM)

Inspection records to federal QC standards.

Best for: Federal and military data centers

Equipment issue tracking

Every defect logged and tracked to the vendor fix.

Best for: Projects with vendor quality issues

How it works

From factory to ready for startup

Submittals

Gear checked against design.

Factory

Witness tests and punch items.

Ship

Packing and protection checks.

Receive

Delivery inspection.

Install

Installation verified.

Ready

Pre-functional checklists signed.

Rule of thumb: never sign the delivery ticket until you have looked at the gear. Damage claims start at the truck.

Ways to work with us

Pick the level of support you need

Start small with a review, put a qualified person on site, or hand us the whole program. Every option is priced to your scope.

Quick start

Factory test support

Script review and witness for one equipment package.

  • Script review
  • Witness
  • Findings report
  • Punch list
Request support

Most popular

Level 1 and 2 support

AAAT3 supports factory tests and installation checks.

  • Factory witness
  • Receiving checks
  • Checklist tracking
  • Weekly reports
Get a quote

Full program

Early Cx management

We manage Levels 1 and 2 for all major equipment.

  • Test coordination
  • Receiving program
  • Checklist management
  • Owner reporting
Talk to a project manager

What you get

Deliverables

Factory test reports

Results and punch items by unit.

Receiving reports

Condition, nameplates and documents.

Pre-functional checklists

Completed and verified by trade.

Issue log

Defects tracked to vendor fixes.

Storage plan

Protection rules for stored gear.

Weekly Cx report

Status and risks.

Standards

Codes and standards we work to

Commissioning

3
  • ASHRAE Guideline 0

    The commissioning processIndustry

  • ASHRAE Standard 202

    Commissioning process for buildings and systemsIndustry

  • NETA ATS

    Acceptance testing of electrical equipmentIndustry

Federal

2
  • UFGS 01 91 00

    Commissioning for federal projectsFederal

  • USACE CQM

    Construction quality managementFederal

FAQ

Common questions

What is Level 1 commissioning?

Factory testing of major equipment before it ships, often witnessed by the owner or commissioning agent.

What is Level 2 commissioning?

Delivery and installation checks on site, including pre-functional checklists that show the gear is ready to start.

Can factory tests be witnessed remotely?

Often yes. Many vendors offer video witness tests, though some owners still require in-person witness for critical gear.

Can AAAT3 manage receiving inspections?

Yes. We inspect deliveries, check documents and set storage rules.

Why do early levels matter so much?

Problems found early are far cheaper and faster to fix than problems found during startup or integrated testing.