Final Documentation & Turnover Package

The owner pays for a building and the documents to run it. AAAT3 collects, checks and organizes as-builts, O&M manuals, warranties and records into one turnover package.

Key numbers

What the rules say

1 year

Standard federal construction warranty, counted from final acceptance unless the contract says otherwise

FAR 52.246-21
1 year

Typical commercial correction period after substantial completion

AIA A201 §12.2.2
9

Core document types in every turnover package we build

AAAT3 checklist

How we do it

Step by step

  1. Requirements list

    Pull every closeout document the contract requires, by spec section.

  2. Track from day one

    Log each submittal as equipment is bought and installed.

  3. Collect

    Gather documents from every trade and supplier.

  4. Check

    Review for completeness, correct equipment and signatures.

  5. Organize

    Index by system and spec section, digital and printed.

  6. Hand over

    Deliver with a transmittal and owner sign-off.

Checklist

What we track and deliver

  • As-built and record drawings
  • O&M manuals
  • Warranties and guarantees
  • Spare parts and attic stock
  • Training records and videos
  • Test and commissioning reports
  • Inspection certificates and permits
  • Keys, access and equipment lists
  • Warranty start dates and contacts

Common problems

Where this usually goes wrong

Manuals for the wrong model

We check every manual against the equipment actually installed.

Unclear warranty dates

We record each warranty's start date, length and contact.

As-builts not updated

We track redlines during the job so record drawings are accurate.

Documents scattered

One indexed package, organized by system and spec section.

Standards

Codes and standards behind this work

5 standardsFederal government requirementIndustry recognized practice

Federal requirements

3
  • UFGS 01 78 00

    Closeout submittalsFederal

  • UFGS 01 78 23

    Operation and maintenance dataFederal

  • FAR 52.246-21

    Warranty of constructionFederal

Commercial & industry

2
  • AIA A201 §12.2.2

    One-year correction periodIndustry

  • ASHRAE Guideline 0

    Commissioning records and systems manualIndustry

FAQ

Common questions

When does the warranty start?

On federal jobs, generally at final acceptance under FAR 52.246-21 unless the contract sets something else. On commercial jobs, check the contract; AIA A201 uses substantial completion for the correction period.

Digital or paper?

Both if the contract requires it. We build an indexed digital package and print what the owner needs.

Can you fix a turnover package that was rejected?

Yes. We review the comments, find what is missing and resubmit a complete package.

Closeout & reporting in detail

Explore each part of closeout

Get a quote for Final Documentation

Tell us about your project, location and where you are in closeout. We reply with a plan and pricing.

Name
What do you need help with?