Subcontractor Prequalification: Check Their Record Before It Becomes Yours

As the prime, a subcontractor’s safety record becomes your risk. AAAT3 checks EMR, OSHA logs, citations, insurance, licenses and safety programs before anyone mobilizes.

Key numbers

What the rules say

1.0

An EMR of 1.0 is the industry average. Below 1.0 is better than average, and many owners and primes set 1.0 as the cutoff

NCCI experience rating
5 years

How long employers must keep OSHA 300 logs and 300A summaries, so there is a record to ask for

29 CFR 1904.33
Prime

The prime contractor assumes all employer safety obligations, whether or not it subcontracts the work

29 CFR 1926.16(b)

How we do it

Step by step

  1. Prequalification package

    Send one questionnaire and document list to every sub bidding the work.

  2. Safety record review

    Review three years of EMR letters and OSHA 300A summaries, and work out TRIR and DART rates.

  3. Citation search

    Search OSHA inspection and citation history for serious, willful and repeat items.

  4. Insurance and licenses

    Check certificates of insurance, required limits, additional insured wording, licenses and registrations.

  5. Written programs

    Confirm the safety program matches the scope, with named competent persons and training records.

  6. Scope fit and past performance

    Check similar work, references and, on federal jobs, CPARS records.

  7. Decision

    Approve, approve with conditions or decline, and file a scorecard for every sub.

Checklist

What we track and deliver

  • Prequalification questionnaire
  • EMR letters (3 years)
  • OSHA 300A summaries (3 years)
  • OSHA citation history
  • Certificate of insurance with required limits
  • Licenses and SAM registration (federal work)
  • Written safety program and site-specific plan
  • Training and competent person records
  • Drug and alcohol policy
  • Past performance references
  • Scorecard and approval letter

Common problems

Where this usually goes wrong

Only checking the EMR

A small company with few hours can show a low EMR. We also check TRIR, DART and citations.

Insurance that lapses

We track every certificate expiration date and ask for renewals before coverage ends.

Paper safety programs

Downloaded programs often miss the real hazards. We check the program against the scope of work.

Mobilize first, vet later

We finish prequalification before the sub is on site, so problems are found on paper.

Standards

Codes and standards behind this work

7 standardsFederal government requirementIndustry recognized practice

Prime and subcontractor responsibility

3
  • 29 CFR 1926.16

    Prime contractor and subcontractor responsibilitiesFederal

  • OSHA CPL 02-00-124

    Multi-employer citation policyFederal

  • FAR 9.104-4

    Primes determine the responsibility of their prospective subcontractorsFederal

Records and programs

4
  • 29 CFR 1904

    Injury and illness recordkeeping (OSHA 300, 300A, 301)Federal

  • EM 385-1-1

    USACE contractor and subcontractor safety requirementsFederal

  • ANSI/ASSP A10.33

    Safety and health programs for multi-employer projectsIndustry

  • ISO 45001 8.1.4

    Procurement and control of contractorsIndustry

FAQ

Common questions

What EMR is good enough?

Many owners and primes ask for 1.0 or lower. We look at EMR together with TRIR, DART and citation history, because one number can hide problems.

Can a sub fail and still work?

Yes, if the gaps can be fixed. We can approve a sub with conditions, such as a corrected program or a named competent person before work starts.

Do you prequalify subs for federal jobs?

Yes. We add federal checks such as SAM registration, CPARS past performance and EM 385-1-1 requirements on USACE work.

Subcontractor & workforce planning in detail

Explore each part of workforce planning

Get a quote for Subcontractor Prequalification

Tell us about your project, how many subcontractors you need checked and your start date. We reply with a plan and pricing.

Name
What do you need help with?